GE Renewable Resources said it’ll spend as much as $400 million over the next few years to build an offshore wind turbine almost 100 meters taller than the Washington Monument.
The new turbine, dubbed Haliade-X, will measure 853 feet tall, the company said. The blades, manufactured by LM Wind Power, will be longer than a soccer field.
Continue here to read the full article on Industry Week || March 05, 2018 |||